Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13706429

- Product Categories
- Shenzhen to undertake profe..
- Shenzhen to undertake profe..
- The mayor of Shenzhen Decor..
- Shenzhen to undertake profe..
- Friendly Links
- home > Supply > Shenzhen epoxy floor parking lot construction. Epoxy floor paint clean room engineering
Information Name: | Shenzhen epoxy floor parking lot construction. Epoxy floor paint clean room engineering |
Published: | 2015-05-18 |
Validity: | 30 |
Specifications: | |
Quantity: | 34.00 |
Price Description: | |
Detailed Product Description: | Shenzhen epoxy floor parking lot construction. Epoxy floor paint clean room engineering Use:!? Garment factories, printing houses, toy factory, textile, electronics plants, sewage plants, paper plants and other types of plant workshops, warehouses, (underground) parking lot and supermarket Large stores. Features: Epoxy paint is a high strength, wear resistance, beautiful floor, with no seams, solid texture, good chemical resistance, easy corrosion, dust, maintenance, low maintenance cost advantages. Construction Technology: 1, plain handle: according to the situation plain good polish, repair, removal; 2, epoxy primer: The exceptionally strong permeability and adhesion roll an epoxy primer to enhance the surface adhesion; 3, the ring Oxygen approved soil: according to the actual needs of the number of road construction required to achieve smooth and no holes, no batch of knives and sanding India Indian subject; 4 epoxy topcoat: Solvent-based epoxy paint or paint roller construction slip After completion of the overall surface bright and clean, color uniform, no hollowing; 5. Construction complete: 24 hours before the Master, 72 hours before stress. (25 ℃ prevail, low temperature for an appropriate extension of the opening hours) Epoxy Instructions 1, after the completion of usable time: 24 hours after opening walk, can withstand 72 hours of light load. 2, the best strength: 7 days after the floor is completely stable performance to achieve the best strength. 3, keep clean: Epoxy ground need to keep clean, if sand and dust particles, hard particles broken materials, the need for timely cleaned, so as not to scratch the ground after rolling; people from outside do not enter into the sand plant dust; the workshop and warehouse, forklift for external use different handover, do not go outside of the truck, which is not out of the truck to avoid into the sand and dust. 4, to avoid bumps and scratches: Avoid overweight machines, object directly hit the ground; avoid sharp device scratch the ground; if forklifts, trolleys, walking, should use rubber wheels. 5, promptly remove oil and solvent: floor despite good acid and alkali resistance of the construction, but also need proper care, if water, acidic or alkaline solvents, oil and other product on the ground, should be cleared up, the best not more than 24 hours. 6, timely repair damaged: the floor finish as breakage, damaged the office have oil dripping, the breakage of the need for timely repair to prevent infiltration of oil and other elements to the structure beneath or paint. 7, particularly the protection of the new floor of completion: the completion of the new plant workshop, there may be other construction units to enter the post-installation, decoration, etc., so the need for special protection Epoxy: (1) personnel access to plant only from one or two entrances, the best school security on duty. (2) In addition to access to personnel need to change shoes or slippers (which can spare some clean soft-soled slippers) to enter. (3) may not have a hard object dragged on the ground, mud, sand, etc. shall be brought into the scene. (4) other operations (such as welding, brush other coatings, etc.) location, be sure to pave the plank on the ground, PVC fabric, cardboard and other materials for skin protection against damage, dirt epoxy. Construction Technology 1. Primary treatment: polished off the loose layer delamination and cement residue, making it hard, smooth, and increase adhesion coating and the ground floor. 2. primer construction: an epoxy sealer with a good, roll coating, knife or brush to fully wet concrete and penetrate into the concrete lining. 3. Construction of the coating: the coating material in an appropriate amount of quartz sand mixed Stir with a trowel trowel to smooth dense layer of a certain thickness. The topcoat batch up: The top coat material coated with silica powder batch, filled the large gap between the particles coated, to be completely cured, polished surface grinding machine with dust, dust with a vacuum cleaner exhaust, polished smooth. 5. Topcoat Construction: After the epoxy paint and hardener mixed, can trowel, brush, roller or spray to leveling to obtain a flat uniform surface coating. |
Admin>>>
You are the 23955 visitor
Copyright © GuangDong ICP No. 10089450, Shenzhen Mayor real waterproof decorative Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 23955 visitor
Copyright © GuangDong ICP No. 10089450, Shenzhen Mayor real waterproof decorative Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility